The contour ditch was done very well. When water runs over the western edge it splits north and south and fills the ditch. There is some hand work to be done to even out some elevations in the ditch, but those only affect low water flows at the moment. It looks like small furrows will be needed to move water around the high spots west of this ditch and the old 1' ditches will need to be sandbagged to move water properly.

One can see that this field is a mess. I still havent figured out how to split the field in half, there is a maze of furrows and ditches in it. I am thinking the Waterman Hydrant and the 6" pipe from the Bath Field should be put to use here.